image image image
  Hydraulic pipe work for bow
thruster being fitted in place.
    Top board of bed cut and fitted.     Bedroom cupboard top and shelf
edging fitted in place.
 
image image image
  Bow thruster pipes coming up through galley floor en route to the engine room.     One of the four water storage tanks.     Windows start to go in.  
image   image
Waterproof panel work being
fitted in the bathroom.
  image
  Bow thruster hydraulics.     Starting to look more like it.  
image image
  Porthole in rear cabin being fitted.           Half of rear cabin from cabin steps.  
  Fit out photo's page
1-2-3-4-5-6-7-8-9-10