image   image
Front bulkhead, different view.
  image
  Forward cabin floor goes down.     Forward cabin looking aft..  
image image
  Forward cabin front bulkhead       Wide shot, battening taking shape.  
image image image
  Forward cabin rear bulkhead.     Forward cabin under gunwales.     Just about done, ready for foam.  
image image image
  Rear cabin, spray foamed,
wiring in, and part panelled. 
    Forward cabin, spray foamed,
wiring in, and best part panelled.
    Forward cabin looking aft, bulkheads for bedroom and bathroom will be fitted soon.  
image image image
  Perkins Sabre M92 bolted in. The engine isn't small, the engine room is just big.     GPS aerial fitted on aft cabin roof.     Temporary wheelhouse to keep the weather out, awaiting window fitting.  
  Fit out photo's page
1-2-3-4-5-6-7-8-9-10